KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 build
' style=
Date:  9-7-2013
Number of Hours:  4.00
Manual Reference:  Page 8-39
Brief Description:  Left tank fuel line

Had lots of fun with this one.

The third try at the right tank fuel line proved to be it. Once I figured out the diameter of the bend and how it had to be measured, I was good to go.

The first line I measured right, but bent at the second line i drew, I bent too far of where I needed and had to set aside both lines for future cutting and use.

Happy with the fit and it doesn't touch the floor and all four adel clamps were temporary installed. This line will come out so that I can rivet the bottom and left side skin.
' style=

Right tank fuel line started

Right tank fuel line started

' style=

Along the spar box

Along the spar box

' style=

Flared, fittted, and good to go

Flared, fittted, and good to go

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.